RESTORATION, EXTENSION, AND RECONVERSION OF THE CONVENTO DE JESUS INTO A MUSEUM
Carrilho da Graça Arquitectos
ARCHITECTS
Carrilho da Graça Arquitectos
LEAD ARCHITECTS
João Luís Carrilho da Graça
PROJECT TEAM
Francisco Freire, Luís Cordeiro, Susana Rato, Filipe Homem, João Pinto, Ana Teresa Hagatong, Berenice Levy, Margarida Lima Belo, João Aragão, João Trindade, João Alves, Giorgio Santagostino, Mónica Margarido, Inês Cortesão, Inês Vieira Da Silva, Patricia Ramalho
LANDSCAPING
Global, Arquitectura Paisagista, João Gomes Da Silva, Arquiteto Paisagista
OUTDOOR SPACES
João Luís Carrilho Da Graça E Global, Arquitectura Paisagista, João Gomes Da Silva, Arquitecto Paisagista;
ENGINEERING & CONSULTING > STRUCTURAL
Afa, Consultores De Engenharia, Adão Da Fonseca, Engenheiro
TECHNICAL CREW
Nuno Pinto, Paulo Barreto, João Rosário
ENGINEERING & CONSULTING > ELECTRICAL
Rúben Sobral, Engenheiro
MUSEOLOGY
João Seabra De Carvalho;
HVAC
Aeroprojecto, José Galvão Teles, Engenheiro;
ENGINEERING & CONSULTING > INSTALLATIONS
Afa, Consultores De Engenharia, Paulo Silva, Engenheiro
PROMOTER
Câmara Municipal De Setúbal
MUSEOGRAPHY
P06-atelier, Nuno Gusmão.
PHOTOGRAPHS
Rita Burmester
AREA
21200 m²
YEAR
2025
LOCATION
Setúbal, Portugal
CATEGORY
Museum, Restoration, Extension
English description provided by the architects.
The Convento de Jesus in Setúbal was designed at the end of the 15th century by Jacques Boytac (a French architect based in Portugal, who later designed the Jerónimos Monastery and the Belém Tower) and featured 16th-century interventions by António Rodrigues (architect of the Chapel of the Eleven Thousand Virgins).
Because the convent was built over the water line of a large valley, its floor level had been successively raised over time, naturally affecting the proportions of its spaces. Furthermore, when the complex was adapted into a hospital, intrusive concrete systems were introduced, placing a heavy load on its structure.
The public competition launched by the municipality aimed to install the Museum of Setúbal in this complex. However, Carrilho da Graça quickly added a second objective: restoring the spatial and constructive logic of the original building.
Following a strategy similar to the one used in the project for the Documentation and Investigation Center of the Presidency of the Republic, the competition proposal suggested leveling the ground from its highest point to the north.
This allowed the defined program (auditorium, temporary exhibition gallery, administration, and library) to be housed underneath, arranged around a water-filled courtyard that seamlessly connected with the pre-existing building.
Although this proposal won the competition, the pragmatism imposed by financial constraints led to a substantial reduction of the program. Ultimately, the completed intervention was limited to a meticulous restoration and reconversion of the pre-existing building.
A protection system was then installed to restore the original level of the building's interior floor. This reinstated the original proportions of the ground floor spaces, restoring the monument's scale and bringing it closer to its initial configuration.
Unlike the intervention at the Flor da Rosa Monastery—where financial restrictions and the absence of structural issues led to accepting the pre-existing building essentially as it was—the fragile limestone masonry walls here were on the verge of collapse.
It was therefore necessary to demolish the 20th-century concrete elements to relieve weight from the walls. These were replaced with wooden structural systems that, despite their contemporary design, closely align with the structural logic of the original building.
Over high-density thermal insulation boards placed on the new timber floor structure, a thin 7-centimeter screed was applied.
This layer provides the necessary acoustic insulation between floors and sufficient inertia for fire protection.
It also accommodates a micro-tubing system for heated or cooled water (maintaining constant temperature and humidity levels with low energy consumption) and routes electrical and data cabling, avoiding the need to cut chases into the fragile existing masonry and leaving the walls untouched.