Non-Commercial Cultural Hub

NON-COMMERCIAL CULTURAL HUB

Ipa Filip Kozarski

Non-Commercial Cultural Hub
© PION Studio

ARCHITECTS
Ipa Filip Kozarski

ARCHITECTS INVESTOR’S REPRESENTATIVE
Paulina Lehmann And The Roark Studio Team

CONSTRUCTION MANAGER / CONTRACTOR
Łukasz Murawski

HERITAGE CONSERVATION SPECIALIST FAÇADE
Anna Kowalczyk Chmielewska

DIRECTOR OF INVESTMENT DELIVERY
Piotr Pisarek

HERITAGE CONSERVATION SPECIALIST
Ewa Jachnicka

INTERIOR DESIGN, VISUAL IDENTITY
Filip Kozarski

TECHNICAL COORDINATION TENANT’S SIDE
Kamil Bamburski

PROJECT MANAGER
Michał Pilachowski

VISUAL IDENTITY
Marian Misiak

SANITARY SYSTEMS
Marek Mizerski

CONTRACTOR
Krzysztof Łaszkiewicz

ELECTRICAL SYSTEMS
Mateusz Boiwko

COORDINATION INVESTOR’S SIDE
Joanna Kwiatkowska

TENANT, CONCEPT ORIGINATOR, OVERALL PROJECT SUPERVISION
Alicja Jabłonowska

MANUFACTURERS
mozi studio

PHOTOGRAPHS
PION Studio

AREA
1500 m²

YEAR
2025

LOCATION
Gdańsk, Poland

CATEGORY
Cultural Architecture, Cultural Center

Non-Commercial Cultural Hub
© PION Studio

English description provided by the architects.

Grid Arthub is located in Hall 31B, a late 19th-century industrial building in the Gdańsk Shipyard, a site historically associated with both shipbuilding and the Solidarity movement.

The project began with an intention to preserve the hall's layered identity while introducing a flexible contemporary program that could support the growing creative sector in Gdańsk. The inspiration came from the building's long and changing history.

Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio

Over time, it served as a wood-drying plant, mess hall, boxing gym, and office space. Rather than erasing these traces, the design sought to work with them, maintaining a sense of continuity while opening the interior to new uses.

The main difficulty was the building's uneven condition. Many elements were deteriorated, and Grid's founder required a strategy centered on reuse rather than replacement. This constraint became a guiding principle.

Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio

Materials were sourced from the hall itself, from nearby buildings, and from institutions replacing or discarding components. The design aimed to achieve a coherent whole while allowing each reused piece to retain its own story.

Reclaimed materials define much of the interior. More than 1,000 square meters of sports flooring were salvaged from the Olympic Training Center in Cetniewo.

Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio

The planks had to be manually removed, cleaned, and reinstalled, and the decision not to sand them preserved the marks and colored lines of their previous life.

Glazing for the studio windows was taken from dismantled skylights on the hall's roof. Stoneware tiles and stone offcuts were reused in flooring.

Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio

Recycled plastic waste was turned into door handles, countertops, and partitions. Visible red and green interior elements were produced from shredded soft-drink crates sourced from a nearby bar.

Furniture was largely handpicked, reused, or constructed on-site using DIY methods, including open-source designs.

Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio

The spatial configuration emphasizes openness, adaptability, and durability. The first floor houses long-term studios, temporary residencies, and a communal workspace.

The layout avoids rigid partitioning, allowing different disciplines to coexist and expand.

Elements such as shelving, large communal tables, and bulletin structures were designed to be easily dismantled or repurposed, ensuring that the space can evolve with the community that occupies it.

Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio

The renovation preserves the industrial character of the hall while introducing practical improvements such as heating, water access, and daylight-optimized workspaces.

These changes, combined with long-term rental agreements, provide stability for artists in a rapidly transforming district.

The project positions the building as a resilient cultural node that continues the adaptive legacy of the shipyard through architectural reuse and flexible design.

Non-Commercial Cultural Hub
© PION Studio


Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio
Non-Commercial Cultural Hub
© PION Studio


Non-Commercial Cultural Hub
Sketch 1
Non-Commercial Cultural Hub
Sketch 2
Non-Commercial Cultural Hub
Sketch 3
Non-Commercial Cultural Hub
Sketch 4


Non-Commercial Cultural Hub
Ground Floor Plan
Non-Commercial Cultural Hub
1st Floor Plan


Non-Commercial Cultural Hub
Foldable Grid Table
Non-Commercial Cultural Hub
Plot Sofa