Shueisha Toon Factory Office – Phase 2

Shueisha Toon Factory Office – Phase 2
© Kenya Chiba

SHUEISHA TOON FACTORY OFFICE – PHASE 2

Gamma Architects

ARCHITECTS
Gamma Architects

CONTRACTOR
Tolowa Co., Ltd.

CUSTOM FURNITURE DESIGN & PRODUCTION
Amma Architects

PRINCIPAL ARCHITECT
Shinya Sueyoshi

PHOTOGRAPHS
Kenya Chiba, Hiroto Sato

AREA
135 m²

YEAR
2025

LOCATION
Japan

CATEGORY
Offices

English description provided by the architects.

Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba

Shueisha TOON FACTORY is a creative company mainly engaged in manga and WEBTOON businesses. For this expansion project, one floor of a tenant building stretching from east to west was targeted for planning.

With openings only on one side and a ceiling height of approximately 2,200 mm, the challenging conditions made the space prone to feeling cramped.

Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba

We designed the floor in a way that utilizes the existing ceiling while achieving both visual spaciousness and comfort.

As a method to compensate for the low ceiling height, we adopted heat-resistant aluminum tape—a material that, while affordable and easy to install, brings depth and flickering light to the space through its reflective surface.

Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba

Approximately 20 kilometers of tape were arranged randomly along the long side of the building, while maintaining a subtle rhythm. Each piece was carefully hand-applied by skilled craftsmen.

The overlapping lines evoke the concentric lines and streamlines drawn in manga backgrounds, creating an environment with both freshness and a sense of unfamiliar familiarity.

Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba

By applying a brushed finish, the light reflects softly, incorporating the surrounding buildings and street trees into the interior floor and adding a sense of depth and continuity.

In the waiting area, a design inspired by the iconic LC2 was used, with discarded weekly magazines repurposed as upholstery.

Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba

For the piping that connects the upholstery, craftsmen hand-wrapped and finished it with the covers of weekly magazines—embedding the company's aesthetic worldview into every detail of the space.

With this office as a backdrop, we hope that each individual working here can, as if inside a comic frame, become the protagonist of their own life and create inspiring work every day.

Shueisha Toon Factory Office – Phase 2
© Kenya Chiba


Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba


Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba
Shueisha Toon Factory Office – Phase 2
© Kenya Chiba