Swimming Hall Finckensteinallee

Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects
Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects

SWIMMING HALL FINCKENSTEINALLEE

Veauthier Meyer Architekten

ARCHITECTS
Veauthier Meyer Architekten

CLIENT
Bbb Infrastruktur

MANUFACTURERS
Küffner

SCOPE OF WORK
Hoai Phases 1-5

AREA
12300 M²

YEAR
2014

LOCATION
Berlin, Germany

CATEGORY
Swimming Pool, Restoration

Text description provided by architect.

B43 Indoor Swimming Pool, Finckensteinallee, Berlin-Lichterfelde .

Swimming Hall Finckensteinallee
Courtesy of Veauthier Meyar Architects
Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer ArchitectsCourtesy Of Veauthier Meyer Architects

The restoration of this extensive South-Berlin pool prioritized the intelligent integration of technical and restoration questions, while placing particular emphasis on the sensitive handling of the historic substance from the design point of view.

The baths, designed by Karl Reichle and Karl Badberger and opened in 1938, were built on the site of a former cadet school and were originally used as a physical training facility for the SS Leibstandarte.

Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects
Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects

At the time of its original completion the competition-standard complex with its 25 x 50 meter pool was the largest and most modern pool in Europe.

In the post-war decades the swimming pool was used by US allies stationed in Berlin, subsequently becoming part of the Berlin Pools Association in 1994. In 2006 the hall was closed due to both wear-and-tear and construction defects.

Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects
Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects

The restoration was carried out according to an architectural concept that differentiated specifically between conservation, re-use, and the further development of structural components and spatial groupings.

The conservation work involved carefully optimising the external shell of the building, while in the pool hall itself the creation of a new roof enabled the architects to recreate the sense of space had been found here up to the 1970s.

Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects
Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects

The showers and changing rooms were prime candidates for further development, as is reflected in the new colour scheme for these zones.

Alongside the careful renovation of the building envelope, the renovation and modernization of this building with its monumental brick façade also encompassed the thorough renewal of all technical and functional elements while ensuring the entire system conforms with contemporary energy standards.

Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects
Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects

Moreover, surviving historic details such as reliefs and natural stone or marble surfaces were authentically restored.

The swimming pool complex, restored to the expression of its original character, was reopened as a public sports pool in September 2014.

Swimming Hall Finckensteinallee
Courtesy Of Veauthier Meyer Architects


Swimming Hall Finckensteinallee
Section
Swimming Hall Finckensteinallee
Section
Swimming Hall Finckensteinallee
Section


Swimming Hall Finckensteinallee
Elevation
Swimming Hall Finckensteinallee
Elevation
Swimming Hall Finckensteinallee
Elevation


Swimming Hall Finckensteinallee
Plan
Swimming Hall Finckensteinallee
Plan
Swimming Hall Finckensteinallee
Plan


Swimming Hall Finckensteinallee
Diagram
Swimming Hall Finckensteinallee
Section Plan